BIOTRONIK Asia Pacific
Conduction System Pacing Summit 6 & 7 March 2026 | BIOHUB | Singapore
Scroll down for course information & downloads
Image
Chairperson
Image
Dr. David Hayes
Chief Medical Officer,
BIOTRONIK Inc.,
Lake Oswego, Unites States of America
Faculty & Speakers
Image
Prof. Dr. Jan De Pooter
Cardiologist & Electrophysiologist,
Heart Centre University Hospital Ghent, Belgium
Image
Dr. Patrick Nagel
Deputy Head of Rhythmology,
German Heart Center of the Charité, Berlin, Germany
Image
Dr. Dian Andina (Andien) Munawar
Cardiologist & Electrophysiologist,
Lyell McEwin Hospital, South Australia
Image
Dr. Keng-Tat Koh
Cardiologist & Director Cardiac Electrophysiology Service,
Sarawak Heart Centre, Kuching, Malaysia
Image
A/Prof. Wee Tiong Yeo
Senior Consultant,
National University Heart Centre, Singapore
Image
Dr. Muthiah Subramanian
Senior Consultant Cardiologist & Electrophysiologist,
AIG Hospital Hyderabad, India
Agenda
| Time | Topic | Speaker |
|---|---|---|
| 10:00 | Welcome & Opening | Lisa Hinrichsen |
| 10:15 | Program outline | Dr. David Hayes |
| 10:30 | LBBAP implant procedure | Dr. Jan De Pooter |
| 11:30 | Determining capture & criteria for successful LBBAP | Dr. Patrick Nagel |
| 12:00 | Lunch at The Plaza | |
| 12:45 | Bachmann's Bundle Case Study | Dr. Muthiah Subramanian |
| 13:35 | Rotation #1 | Faculty & BIOTRONIK team |
| 14:35 | Afternoon tea at The Plaza | |
| 15:00 | Rotation #2 | Faculty & BIOTRONIK team |
| 16:00 | Q&A with panel | Faculty panel |
| 16:30 | Departure to hotel | |
| 18:00 | CSP dinner event |
| Time | Topic | Speaker |
|---|---|---|
| 09:00 | Tips & Tricks for stylet-driven leads (SDL) | Dr. Keng-Tat Koh |
| 09:40 | Advanced troubleshooting | Dr. Jan De Pooter |
| 10:30 | Rotation #3 | Faculty & BIOTRONIK team |
| 11:30 | Lunch break at The Plaza | |
| 12:15 | Rotation #4 | Faculty & BIOTRONIK team |
| 13:15 | Q&A with panel | Faculty panel |
| 13:45 | Feedback & wrap-up | All |
| 14:00 | Departure to hotel or airport |
Rotation Info
| Topic | Venue | Rotation #1 | Rotation #2 | Rotation #3 | Rotation #4 |
|---|---|---|---|---|---|
| CSP simulator workshops | Simulator 1/2/3 (L7) | Groups G/H/I | Groups J/K/L | Groups A/B/C | Groups D/E/F |
| Leads manufacturing tour | Manufacturing (L6) | Groups A/B/C | Groups D/E/F | Groups G/H/I | Groups J/K/L |
| Porcine dissections | 1963 (L8) | Groups D/E/F | Groups G/H/I | Groups J/K/L | Groups A/B/C |
| Lead design & case study | Intica/Selectra/Enitra (L7) | Groups J/K/L | Groups A/B/C | Groups D/E/F | Groups G/H/I |